Skip to content

toll

Positions with this command: switch (Switching Station Technician).


NAME
     toll - the toll network

SYNOPSIS
     toll
     toll hierarchy
     toll load

DESCRIPTION
     The toll network consists of the class 4 and higher offices. Class 5 is
     the end office, where subscriber loops terminate, and is not part of
     it. This command shows the network as the routing engine holds it: how
     many offices sit at each class, what homes on what, and how the trunk
     groups between them are loaded.

     Each office is joined to one of higher class by a final group and is
     said to home on it. A call is completed at the lowest level of the
     hierarchy that can carry it, using the fewest trunks in tandem, which
     is why a typical toll connection takes three: up a toll connecting
     trunk, across one intertoll group, and back down.

OPTIONS
     (none)            Offices by class, and trunking summary
     hierarchy         The homing chain, class by class
     load              Trunk group occupancy

GRADE OF SERVICE
     Final trunk groups are engineered to P.01 - one call in a hundred finds
     all trunks busy. High-usage groups are engineered to P.10, because
     overflowing is what they are for.

QUALIFICATION
     Requires the Toll Network sign-off.

SEE ALSO
     routing(1), testcall(1), trunk(1), traffic(1), tnds(1)

QUALIFICATION VERB
     toll control <block|reroute|off>

     Held with the Toll Network sign-off. Puts a network management control
     on, which holds calls off a route. Fewer calls that never complete
     means fewer no-trouble reports reach the bureau: block cuts them to
     four in ten of what they were, reroute to seven in ten. It also keeps
     real customers off the network, and every report that arrives while
     it is on carries a commitment shorter by 20 minutes for block and 8
     for reroute. It stays on for the rest of the tour, until it is taken
     off with toll control off. Engineering
     and Operations notes that manual controls are often left in effect
     too long. It costs 10 minutes to put on and 10 to take off.