Skip to content

report


NAME
     report - work the repair service bureau's board of customer trouble
     reports

SYNOPSIS
     report [board]
     report next
     report show <number>
     report callback <number> [topic]
     report dispatch <number> <force> [cable/binder]
     report close <number> <5|8> [fault]
     report closed | faults | forces

DESCRIPTION
     A customer trouble report arrives with nothing but the customer's own
     words. What is actually on the pair is not known until it is measured,
     and locating the trouble is described in Engineering and Operations in
     the Bell System as the most difficult and time consuming step of
     corrective maintenance. That is the work this command is for.

     The sequence is detect, notify, verify, locate, repair, verify. The
     bureau has done the first two by the time a report reaches your board.
     The rest is yours.

OPTIONS
     board             The pending list, nearest commitment first
     next              The one report that most wants working, and what it
                       wants. The same decision the standing prompt makes
     show <n>          The line record, the symptom and everything done so far
     callback <n>      Telephone the customer for more than the card carries.
                       Name a topic (start, others, hear) to ask the one
                       question; each call costs the same minutes
     dispatch <n> <f>  Send a repair force. The wrong force costs time.
                       Cable repair also wants the cable and binder group
                       to open, as 81/8, where the job is run that way;
                       a group with no water in it is a wrong trip too
     close <n> 5 <c>   Trouble found. Name the condition you found
     close <n> 8       No trouble found
     closed            What has been closed this session, and how it was judged
     jobs              The plant jobs the cable pressure alarm has opened. A
                       job has no customer: dispatch to it by its number,
                       as PJ-001, naming the cable and binder group
     faults            The trouble conditions and what each measures like
     forces            The repair forces a report may be dispatched to

DISPOSITION CODES
     Two codes are used, and both are published Bell System dispositions
     counted separately in the network switching performance measurement
     plan:

     5    Trouble found. A fault was located and corrected.
     8    No trouble found. The report is closed without a repair.

     Closing a faulty line as code 8 does not fail loudly. It closes, and
     then the customer calls back. That repeat is what the measurement plan
     was counting.

     Some trouble does not wait for a crew. A ground, a cross or foreign
     voltage can clear by itself between one test and the next, and a line
     that read faulty an hour ago may read clean now. A close is judged
     against the line as it stands when it is made, and a crew sent after
     the trouble has gone finds nothing.

REFERRING TO A REPORT
     A report answers to its number (TR-04471), to the telephone number on
     it, or to its position on the board (1, 2, 3).

AS FILES
     The board is also a directory. /usr/lmos holds one file per report
     with the whole record on it, alongside three that are always there:

     board       The pending list, one line to a report
     closed      What has been closed this session, and how it was judged
     cable       The wet sections, the pairs they have taken, and the
                 weather that is making them worse

     So the second way to work is the shell:

          grep WRONG /usr/lmos/closed
          cat /usr/lmos/TR-04471
          ls /usr/lmos | wc -l

     Your mail is a file too, under /usr/spool/mail, and the practices are
     under /usr/bsp.

TIME
     Every action is charged against the report's commitment: a measurement
     costs four minutes, a call back eight, a repair as long as that repair
     takes, and a trip by the wrong force forty-five. The commitment
     intervals and these costs are the simulation's own; none of the period
     documents SOURCES.md lists states the Bell System's actual commitment
     policy.

SEE ALSO
     mlt(1), testboard(1), testline(1), qual(1), trouble(1)