testboard
NAME
testboard - central office test board
SYNOPSIS
testboard
testboard loop <report>
testboard supervision <circuit>
testboard results
DESCRIPTION
The board is where the three testing systems meet. Loop measurement
goes through mechanised loop testing, transmission goes through the
test line series, and supervision is what single frequency signalling
shows about a trunk.
OPTIONS
loop <report> Measure a subscriber loop. Same as mlt(1)
supervision <circuit> Single frequency supervision state of a trunk
results Every measurement taken this session
status Board status and what is on it
SUPERVISION
Single frequency signalling puts 2600 Hz on a trunk while it is idle
and removes it when the trunk is seized. That makes the tone a
supervisory signal a craftsperson reads directly:
Tone on, trunk idle normal
Tone off, trunk seized normal
Tone on far end only far end released, near end has not
Tone present during a connection irregularity. Report it and hold the
circuit out of service
Routine testing of these groups is run by CAROT, which reports its
exceptions to the maintenance teletype whether anybody is reading or
not.
SEE ALSO
mlt(1), testline(1), report(1), trunk(1)