Skip to content

cosmos


NAME
     cosmos - wire centre administration and main frame operations

SYNOPSIS
     cosmos [status]
     cosmos assign <number>
     cosmos jumper <number>
     cosmos balance
     cosmos pending

DESCRIPTION
     Computer System for Main Frame Operations. The main frame is the
     main distributing frame - the manually operated field of
     terminations where outside plant cable meets central office
     equipment - and not a mainframe computer.

     COSMOS exists to minimise congestion and long cross-connects on the
     frame while keeping load balanced across the switching equipment in
     the wire centre. It holds the line and number inventory, assigns
     office equipment and frame appearances, and prints the frame work
     orders a frame technician works from.

THE FRAME
     The vertical side carries outside plant cable terminations through
     protector units; the horizontal side carries office equipment
     terminations. A jumper run between them cross-connects a customer's
     pair to their line equipment. Preferential assignment places that
     jumper as short as possible, because a frame full of long jumpers
     becomes congested and hard to work.

     Setting a protector unit to its inactive position disconnects a
     customer temporarily without disturbing the cross-connection.

OPTIONS
     status            Frame occupancy, jumper administration, balance
     assign <number>   Assign office equipment and a frame appearance
     jumper <number>   Show the cross-connect record for a line
     balance           Load balance across the line link groups
     pending           Frame work orders awaiting the frame technician

NOTES
     COSMOS transaction syntax is not reproduced from any source
     available to this simulation. The commands here are its own.

QUALIFICATION
     'cosmos jumper' reads a record and is open to everyone: it is how a
     loop that measures clean is told from a jumper on the frame. The rest
     needs the Main Distributing Frame sign-off, which is also what lets
     you put a jumper right ('cosmos fix').

SEE ALSO
     clli(1), switch(1), trouble(1)

QUALIFICATION VERB
     cosmos fix <report>

     Held with the Main Distributing Frame sign-off. Goes down to the
     frame and puts right what cosmos jumper showed: a jumper run to the
     wrong horizontal, a protector unit left operated, a leg off the
     terminal. The trouble is cleared without a truck, the cross-connect
     record agrees with the plant afterwards, and the report is ready to
     close. It costs 15 minutes. On a line with nothing wrong at the frame
     it costs the 2 minutes of looking and changes nothing.