NAME
mlt - mechanised loop testing
SYNOPSIS
mlt <report number | telephone number>
DESCRIPTION
Measure a subscriber loop from the test desk and report the readings.
Two different measurements are reported and they must not be confused.
Insulation resistance is taken with the loop open and the office
battery removed. It is high on a healthy pair - hundreds of thousands
of ohms or more - and low wherever a fault is bridging something. Tip
to ring, tip to ground and ring to ground are each read separately,
because which one is low is what tells you what the fault is.
Loop resistance is the resistance of the pair itself with the loop
closed. It is the number the 1300-ohm design limit applies to, and an
open pair has none to read.
Capacitance is the third reading and the most useful one. Local
exchange cable runs 0.083 microfarads to the mile, so a capacitance
measurement on an open pair is a distance to the break.
READING THE RESULT
Infinite tip to ring, no station termination open
Near zero tip to ring short
One conductor low to ground, tip to ring normal ground
Foreign potential with no battery applied foreign EMF
Several pairs low in one cable wet cable
Everything within limits, loop closed, current receiver off hook
Loop clean to the frame, customer still cut off office equipment
DESIGN LIMITS
Loops of 18 kft or less were designed to 1300 ohms maximum and
nonloaded. Loops between 18 and 24 kft were designed to 1500 ohms with
H88 loading. Anything longer went on digital loop carrier. A coin
station needs 23 milliamperes to operate, which puts its own range
limit at the same 1300 ohms, about three miles.
DIFFICULTY
On the forgiving setting the system names the condition it reads for
the first four times you meet each kind of trouble: the first two with
the condition, the crew and a note on why the numbers say so, the next
two with the crew alone. From the fifth it prints the numbers and
nothing else, because reading them is the job. The count is kept for
the whole career, for each kind of trouble separately, and a crew's
report of what they cleared follows the same count. The other
setting prints the numbers from the start. 'set assist.annotate on'
keeps the notes for good; 'off' drops them at once.
NOTES
The abbreviation table in Engineering and Operations expands MLT as
"mechanical loop testing". The system was more widely called Mechanized
Loop Testing. The conflict is recorded here rather than resolved.
SEE ALSO
report(1), testboard(1), testline(1)